Construction Update

Chaffey College Measure L Citizens’ Oversight Committee

Latest News and Announcements


Download Recent Reports
    May 2009
    April 2009
    March 2009
    February 2009
    January 2009
    December 2008


Construction Bid questions should be directed to 909/652-6701



bernards


construction update banner

Chaffey College serves more than 20,000 students today. Through the Capitol Improvement Project the college will be able to provide education to the residents of the growing Inland Valley, more importantly, those seeking an education at Chaffey.
Recent Completions | Under Construction | In Pre-Bid/Planning | Future Projects | Program Budget |

Overview


With the issuance of the first $47.7 million in construction bonds, Chaffey College began the first phase in the Capitol Improvement Project – Facilities Master Plan. The Facilities Master Plan is funded by a general obligation bond, Measure L, passed by voters in the Chaffey Community College District on March 5, 2002. The bond authorizes the college to issue up to $230 million in bonds during a 10 year period. A Citizen’s Oversight Committee meets each quarter to review the financial status and the construction progress. The Chaffey College Facilities Master Plan consists of new construction, infrastructure repair, renovation and upgrades to existing facilities, and procurement of educational equipment. The Capital Improvement Program has made significant progress. This is a summary of the completed projects and construction in progress.


Projects Under Construction


  Chino Health Science Parking Lot

Architect: MDA Johnson Favaro
Construction Manager: Chaffey College
Contractor: Laird Construction Co., Inc.
Contract Start: June 15, 2009
Contract Completion: August 15, 20
Original Contract: $414,550
Approved Change Orders: $0
Revised Contract: $414,550

Scope: The construction of a 100,000 sq. ft. parking lot with 194 parking stalls south and west of the existing parking lots.The parking lot will be adjacent to the exisitng Main Instructional Building.
Status: Construction is scheduled to begin June 15, 2009. The bid was approved at the May 2009 board meeting.

 



  Language Arts/Social Science-HVAC Project

Architect: P2S Engineering
Construction Manager: Bernards
Contractor: Siemens
Contract Start: May 15, 2009
Contract Completion: August 14, 2009
Original Contract: $2,700,000
Approved Change Orders: $0
Revised Contract: $2,700,000

Scope: This is an energy project upgrade to the Language Arts and Social Science building, which will include installation of new air handling equipment and new lighting systems.
Status: Demolition is complete and work is proceeding on schedule with installation of new equipment and finishes.

ps roof
Social Science-interior view of the classroom.



  Data and Telecom Cabling-VPA, New Gym, & Physical Science

Architect: P2S Engineering
Construction Manager: Bernards
Contractor: T and D Communications, Inc.
Contract Start: May 14, 2009
Contract Completion: November 6, 2009
Original Contract: $154,882
Approved Change Orders: $0
Revised Contract: $154,882

Scope: This project is the installation of data and fiber cabling for the Visual and Performing Arts Complex, New Gymnasium, and the Physical Science Building.
Status: T and D Communications, Inc. has been working on Phase One, which includes placing new media to the Physical Science building and the music, ceramics, and fashion buildings at the Visual and Performing Arts Complex. T and D Communications, Inc. began working on this phase at the end of the spring 2009 semester. Manhole survey and copper installation work for these buildings has been completed. The remainder of the work for this phase is to be completed by mid June 2009.

manhole
Interior view of manhole in preparation for new cabling.



  Physical Science Complex-Roof Replacement

Architect: WWCOT Architect
Construction Manager: Chaffey College
Contractor: Cabral Roofing and Waterproofing Corp.
Contract Start: May 21, 2009
Contract Completion: August 7, 2009
Original Contract: $623,636
Approved Change Orders: $0
Revised Contract: $623,636

Scope: Replacement of the existing roof at the Physical Science building with a standing seam metal room.

Status: The underlayment of the roof has been applied. Standing seam metal panels will begin to be installed the week of June 8, 2009. The roof will be complete before the start of classes for the fall 2009 semester.

ps roof
Re-roof application.



  Fontana Phase III-Parking Lot

Architect: HMC Architects
Construction Manager: Bernards
Contractor: Bogh Engineering, Inc.
Contract Start: May 11, 2009
Contract Completion: October 5, 2009
Original Contract: To Be Determined
Approved Change Orders: $1,089,000
Revised Contract: $1,089,000

Scope: The Fontana Phase III Parking Lot project consists of the construction a new parking lot, landscaping, driveway/fire lanes, walkways, utilities, lighting, and signage at the Fontana Campus.

Status: Bogh Engineering, Inc. has completed the demolition of the existing asphalt paving, and has begun the over excavation of the site. A portion of the new parking lot will be ready for the fall 2009 semester.

fontana lot
Phasing and Logistics plan for the parking lot.

     
fontana lot
Over excavation of the parking lot site.
  fontana lot
Clearing of debris and existing curb removal.



  Visual and Performing Arts Complex/Music Building

Architect: Hammel, Green & Abrahamson, Inc.
Construction Manager: Bernards
Contractor: ProWest Constructors
Contract Start: February 2008
Contract Completion:  
- Bldg. B & C- Ceramic Lab/Art Studio Summer 2009
- Bldg. F –Art Complex Fall 2009
- Bldg. E- Music Building Summer 2009
Original Contract: $22,145,000
Approved Change Orders: $871,678
Revised Contract: $23,016,678

Scope: This project is comprised of four buildings—two new buildings and two buildings that will be renovated. The Performing Arts building, the main building, will be a three-story structure. Including an art complex, digital media labs, photo studio, dance studio, and post-production lab, art studio, audio lab, interior design lab, lecture rooms, and faculty offices, this structure will be 46,000sq. ft. Additionally, there will be a 5,500 sq. ft. one-story music rehearsal building constructed. This will include instrumental and choral rooms. The two existing buildings will be renovated and modernized into a Ceramics lab and Fashion Art studio.

Status: At the Performing Arts Building, ProWest Constructors has begun the exterior sheathing in preparation to begin exterior plaster finish. The lower level classroom walls have been textured and painted. Drywall and insulation installation has begun at the main level interior walls. Interior framing at the upper level and mechanical, electrical, and plumbing rough in is on going. The air handler units have been lifted onto the upper level mechanical area. At the Music Building, the installation ceramic tile in the restrooms is complete. ProWest Constructors is continuing to install the cement board panels at the exterior obuilding. The interior of the Music Building has been textured and painted. ProWest Constructors began plumbing and electrical finishes at the fashion and ceramic buildings. The exterior and interior of the fashion and ceramic buildings have been painted. ProWest Constructors is continuing to finish pick up items in the fashion and ceramic buildings in order to meet the completion date of June 26,2009.


vpa rendering
Exterior rendering of the building.

aerial
Aerial photo looking south onto the Visual and Performing Arts Complex.
     
perfarts
Exterior sheathing at the Performing Arts Complex.
  music
Installation of exterior cement panels at the Music Building.



  Physical Education Athletics-New Gymnasium

Architect: NTD Architecture
Construction Manager: Bernards
Contractor: Edge Development, Inc.
Contract Start: September 29, 2008
Contract Completion: December 23, 2009
Original Contract: $8,560,543
Approved Change Orders: $17,527
Revised Contract: $8,578,070

Scope: This project consists of a new 22,000 sq. ft. gymnasium. It will include locker rooms and a snack bar.

Status: At the New Gymnasium, Edge Development, Inc. is continuing installation of the masonry block and embeds at the elevator tower, which is to be completed at the end of May 2009. Structural Steel erection has begun with the steel trusses being set first followed by the rest of the structural steel roof system and exterior steel columns for the sun control devices. The erection and setting of the structural steel is to be completed in June 2009. The remaining interior curbs have been formed and poured. Prep work and forms for the footings at the transformer room and the site planter have been completed with concrete to be poured at the beginning of June 2009. In addition, the exterior area at the north/ east corner have been formed and prepped for footings for the ramp to the handball courts. Edge Development, Inc. has begun trenching and installation at the west side of the New Gymnasium for added work of bringing extra chilled and hot water lines to the existing gymnasium.


gym rendering
Exterior rendering of the building.

     
trusses
Erection of structural steel trusses for the roofing system.
  aerial
Aerial photo looking north onto the Physical Ed Facility New Gymnasium.
     
tower
Installation of CMU block at the elevator tower.
 



  Library Lawn/Fontana Phase II Landscaping

Architect: Steve Frenken Landscape Architecture
Construction Manager: Bernards
Contractor: Land Forms Landscape Construction
Contract Start: August 20, 2008
Contract Completion: November 25, 2008
Original Contract: $385,000
Approved Change Orders: ($450)
Revised Contract: $384,550

Scope: This project consists of landscaping and creating the irrigation system for the Fontana Campus Phase II project and the library lawn area at the Rancho Cucamonga campus.

Status: Land Forms Landscape Construction has completed the first mow at the Fontana campus, with project turn over and acceptance by the Grounds Manager scheduled for the first week of June 2009. At the Rancho Cucamonga campus, the project is still in the maintenance period with the first mow scheduled tentatively the middle of June 2009. Land Forms Landscape Construction is continuing to maintain with watering, weed removal, and cleaning at the Rancho Cucamonga campus.

fontana
Landscaping at the Fontana Campus.
     
fontana
Landscaping at the Fontana Campus.
  ancho cucamongarc campus
Landscaping at the Rancho Cucamonga Campus.
     
rc campus
Landscaping at the Rancho Cucamonga Campus.
   



Projects in Pre-Bid/Planning


  Campus Center West

Architect: MDA Johnson Favaro
Construction Manager: Bernards
Contractor: To Be Announced
Contract Start: To Be Announced
Contract Completion: To Be Announced
Original Contract: To Be Announced
Approved Change Orders: To Be Announced
Revised Contract: To Be Announced

Scope: The existing Campus Center West building will be demolished, and construction of a new 16,454 sq. ft. Campus Center West will be constructed in its place. Select modernization of the Campus Center East will occur as well.

Status: Project has completed the design verification process with the College Design Standards and College User Groups. Swing space plans are in the development stage for this project. MDA Johnson Favaro expects final Division of the State Architect approval of all back check comments by mid June 2009. The project bid documents are in process to get the project ready to bid.


ccw
Rendering of interior cooridor.
     
ccw
Floor plan of new building.
  ccw
Rendering of interior dining area.



  Fontana Phase III-Academic Building

Architect: MDA Johnson Favaro
Construction Manager: Bernards
Contractor: To Be Announced
Contract Start: To Be Announced
Contract Completion: To Be Announced
Original Contract: To Be Announced
Approved Change Orders: To Be Announced
Revised Contract: To Be Announced

Scope: Comprised of 30,400 sq ft., this will be a new academic building. Inside the building, there will be four classrooms, two labs with prep rooms, a library, a bookstore, student lounge, dance studio, and administration offices.

Status: The Division of the State Architect has approved the main building, and HMC Architects is working on the back check comments. The project will be resubmitted to Division of the State Architect for final approval by the end of June 2009. In early July 2009, the project will be submitted to the State Chancellor’s office for approval to proceed to bid and award of the contract. Tentative construction is to start in fall 2009, subject to approval of state funding.


fontana
Exterior rendering of the building looking north.

     
fontana
First floor plan layout.
  fontana
Second floor plan layout.



  Omnitrans Transit Center

Architect: HMC Architects
Construction Manager: Bernards
Contractor: To Be Determined
Contract Start: To Be Determined
Contract Completion: To Be Determined
Original Contract: To Be Announced
Approved Change Orders: To Be Announced
Revised Contract: To Be Announced

Scope: Design and construction of a new transit bus center for the loading and unloading of the Omnitrans buses on the Rancho Cucamonga campus.

Status: The project is in the pre-design development / pre-construction phase. HMC Architects is working with Omnitrans and the College on the design issues of the Transit Center. Based upon the approval process with DSA and Omnitrans, tentative construction is scheduled for summer 2010.




omnitrans



  Gymnasium Remodel

Architect: NTD Architecture
Construction Manager: Bernards
Contractor: To Be Announced
Contract Start: To Be Announced
Contract Completion: To Be Announced
Original Contract: To Be Announced
Approved Change Orders: To Be Announced
Revised Contract: To Be Announced

Scope: Renovation of the 30,843 sq. ft. existing athletics building.

Status: Project is DSA approved and is in design verification process with the College Design Standards and College User Groups. Swing space plan is in the development stage for this project before the start of construction can be scheduled.






Measure “L” Build Out Future Projects


   Central Plant Build-Out

Status: This project is scheduled as an energy project and is in the design development phase with P2S Engineering, Inc.

   Physical Science-Northwest Section and
   Southeast Section Remodel

Status: This project is in the design development phase.


   Liberal Arts and Letters

Status: Awaiting approval of the State funding proposal pending passage of the State Revenue Bond measure.

   Library Remodel / Expansion

Status: Awaiting approval of the State funding proposal pending passage of the State Revenue Bond measure.




Projects Recently Completed


  Health and Life Science (HLS) Re-Roofing

Architect: WWCOT Architects
Construction Manager: Bernards
Contractor: Best Contracting Services, Inc.
Contract Start: January 1, 2008
Contract Completion: June 13, 2008
Original Contract: $456,169
Approved Change Orders: $16, 383
Revised Contract: $472,552

Scope: Comprised of the Health Science Building and the two Life Science Buildings, the Health and Life Science Re-Roofing Project, consists of the removal of an existing built up roof on all three locations, and the construction of a new standing seam metal roof.


hls roof
Newly installed metal roof.


  Physical, Health, Life Science (PHLS) Renovations

Architect: WWCOT Architects
Construction Manager: Bernards
Contractor: PW Construction, Inc.
Contract Start: June 16, 2007
Contract Completion: Phase 1: June 18, 2008
Phase 2: August 15, 2008
Original Contract: $8,196,500
Approved Change Orders: $871,357
Revised Contract: $9,067,857

Scope: Comprised of 22,997 sq. ft., the Physical, Health, and Life Science Project consists of the renovation of five existing buildings.



lecture
Completed dental lab at Physical Science.



  New Marquee Sign

Architect: Hammel, Green & Abrahamson, Inc.
Construction Manager: Bernards
Contractor: Quiel Bros. Electric Sign
Contract Start: December 27, 2007
Contract Completion: June 2008
Original Contract: $180,000
Approved Change Orders: $1,500
Revised Contract: $181,500

Scope: Removal and replacement of the existing marquee sign located at the Haven Avenue entrance. The new marquee sign is a double-sided display board constructed of brushed aluminum and baked enamel surfaces.

marquee
New marquee sign at Haven Avenue entrance.



  Parking Lot #12/Elevator

Architect: GKK Works
Construction Manager: Bernards
Contractor: Edge Development, Inc.
Contract Start: May 16, 2007
Contract Completion: November 11, 2007
Original Contract: 1,897,007
Approved Change Orders: $68,534
Revised Contract: $1,965,541

Scope: This project completely re-constructs Parking Lot 12 (Phase 1) including two accessible parking areas, sidewalks, lights and landscaping. An elevator (Phase 2) was also constructed connecting the VSS facility to Parking Lot 12.

elevator
Elevator tower and stairs leading to VSS.



Program Budget


   Program Fund Sources


sources


   Program Committed Costs


costs